Value Review

(VCDesign Value Review)

A decision record and review sheet to hand off implementation without value loss.

Contents

README

vcdesign-value-review

vcdesign-value-review is a value-design repository to determine, before implementation, which value is protected inside which boundary.

This repository is neither a design manifesto nor an implementation guide. It exists to preserve traces of judgment and hand them to implementation without value loss.

What this is

What this is not

Where this is effective (scope)

Suitable for projects that meet these conditions:

Note: For areas like games, ad landing pages, and entertainment where rapid iteration and disposal are expected, this can be too heavy.

Deliverables

Minimum glossary

Principle

Writing RCL before seeing the whole picture becomes blame shifting, not design.
RCL is not the entrance; it is the line of resolve taken on by a fully maximized design.

Value Review Sheet

VCDesign Value Review Sheet (v0.1)

Purpose: A review sheet to confirm value is not damaged before writing RCL.
Positioning: This sheet is a "review document". Only L4 Pass graduates to RCL.

How to use (minimum)

  1. L1: List business flows (Do). Start with action rows.
  2. L2: Expand PDΔA behind each Do (Man / Machine / Material)
  3. L3: Select system intervention (Detect / Notify / Block / Ignore)
  4. L4: Review if the whole flow maximizes value; if Pass, graduate to RCL

L1. Business flow (Do listing)

L1-1. Flow (Do) list

L1-2. Minimum boundaries

Do not use all 11 boundaries. Minimum is "People / System / Data / External".

L2. PDΔA per Do (Man / Machine / Material)

Do is the entrance, not the end of responsibility.
Move away from cultural PDCA and toward observable deltas.

L2 template (one block per Do)

Do-XX: <Do name>

Man (people)

Machine (system)

Material (data / information)

L3. Intervention policy (what to do and how)

Decide which deltas from L2 the system will intervene on.
"Do everything" is basically NG. Not doing (Ignore) is also design.

L3-1. Intervention levels (4 choices)

L3-2. Intervention policy per Do

L3-3. Only if you choose Block

L4. Max-value review (gate)

Judge whether the shape can keep responsibility, not feature count.

L4-1. Max-value checklist (Yes/No)

L4-2. Conclusion (short)

L4-3. Judgment

Graduate to RCL (outside this sheet)

Only L4 Pass creates an RCL sheet.
RCL is not a tool to build, but a meter to protect design value.

Resources